| Overall
load of energy will be about 60% of the connected load |
| Top |
| Technical
Characteristic: |
|
80
M3/HR |
100
M3/HR |
200
M3/HR |
300 M3/HR |
| Air
Compressor Capacity |
440
M3/Hr. at 60 Kg/cm2. |
565
M3/Hr. at 60 Kg/cm2. |
1150
M3/Hr. at 60 Kg/cm2.(Approx) |
1800
M3/Hr |
| Starging
Pressure |
55
kg/Cm2 |
50
kg/Cm2 |
45
kg/Cm2 |
45
kg/Cm2 |
| Operating
Pressure |
30
- 40 kg/cm2 |
30
to 40 kg/cm2 |
36
to 38 kg/cm2 |
30
kg/cm2 |
| Starting
time till production |
7
Hrs. |
7
Hrs. |
7
Hrs. |
7
Hrs. |
| Defrosting
time |
4/6
Hrs. |
4/6
Hrs. |
4/6
Hrs. |
4/6
Hrs. |
| Defrosting
cycle at normal condition |
12
months |
12
months |
12
months |
12
months |
| Power
supply required |
420V
220V 3Phase 50 Hz |
420V
220V 3Phase 50 Hz |
420V
3Phase 50 Hz |
420V
220V 3Phase 50 Hz |
| Rated
through out of liquid Oxygen Pump |
80
M3/Hr. |
100
M3/Hr. |
200
M3/Hr. |
300
M3/Hr. |
| Delivery
Pressue of pump |
165
kg/cm2 |
165
kg/cm2 |
165
kg/cm2 |
165
kg/cm2 |
| Cylinder
connections, filling manifold |
2
x 8 |
2
x 12 |
2
x 20 |
2
x 20 |
Cooling
water requirement
(Re-circulated) |
40
M3/Hr. |
40
M3/Hr. |
70
M3/Hr. |
100
M3/Hr. |
Make-up
water requirement
(depending upon cooling tower and ambient condition)
|
Approx.0.5
M3/Hr. |
Approx.0.5
M3/Hr. |
Approx.0.5
M3/Hr. |
Approx.1.0
M3/Hr. |
| Max.
Individual item wt. |
5
Tons |
6.5
Tons |
10.2
Tons |
12
Tons |
| Gross
weight |
25
Tons (approx.) |
25
Tons (approx.) |
40
Tons (approx.) |
60
Tons (approx.) |
| Insulation
|
Perlite. |
Perlite. |
Perlite. |
Perlite. |
| Assembly
Height |
8.0
meters. |
8.0
meters. |
11.0
meters. |
12.0
meters. |
| Area
required |
200
sq.mtrs. |
200
sq.mtrs. |
300
sq.mtrs. |
500
sq.mtrs. |
| Material
of construction |
Copper,
Brass, Steel etc. |
Copper,
Brass, Steel etc. |
Copper,
Brass, Steel etc. |
Copper,
Brass, Steel etc. |
| Power
consumption |
1.4
units/M3 of Oxygen |
1.2
units/M3 of Oxygen |
0.9
to 1.0 units/M3 of Oxygen gas. |
1.0
units/M3 of Oxygen gas. |
| Total
Power requirement |
--- |
--- |
400
H.P. |
620
H.P. |